Maramara has recently completed the underside works for the Dedari 40 ML Water tank with SRG Global. With a big push by our team, and the client, our guys were able to excavate out the in-situ material and replace it with higher strength fill and cracker dust. The team at Dedari have installed a robust foundation for the concrete works, inclusive of trimming to within 5mm accuracy. Works continue on the Water Corporation assets at Dedari and Merredin with trenching, road construction and asbestos removal still to take place.